Get a machinery movement quote that matches the job
- Reading time
- 3 minutes
- Last reviewed
On this page
A machinery movement quote is only as useful as the job description behind it. Send the contractor the asset identity, removal configuration, documented weight, access route and required destination. Mark unknowns plainly so the contractor can decide what needs a site visit or further assessment.
"Machine collection from our factory" leaves too much open. It may omit disconnection, dismantling, internal movement, loading, road transport or positioning at the receiving site.
Assemble the enquiry pack
1. Identify the asset. Include manufacturer, model, serial, current location and photographs. Show attachments and ancillary equipment that form part of the movement.
2. Describe its dimensions and configuration. Record measured dimensions and their units. State whether they cover the complete machine, its transport configuration or a proposed dismantled section. Do not offer a dismantled dimension until the method and scope have been confirmed.
3. Provide weight evidence. Identify the source: a relevant manufacturer document, plate, weighing record or competent assessment. Check whether that evidence covers installed options, fluids and accessories. If the weight is unknown, write "unknown, confirmation required".
4. Provide the site route. Attach the access survey and current photographs, including turns, thresholds, overhead restrictions and the loading area. Record permissions and working-time limits.
5. Define the service required. State the start and end points, who handles each preparatory task and what the contractor is being asked to provide. Include the receiving site's access and unloading arrangements.
6. List timing and dependencies. Give the earliest readiness condition, permitted collection period and any supporting equipment that must remain available. Distinguish a desired date from a confirmed booking.
Use manufacturer information carefully
A brochure for a similar model may help locate the right document, but it is not verified information for the actual machine. Modifications, options and installation arrangements can matter.
Provide available drawings and lifting-point information for the contractor's assessment. Do not identify an apparent bracket as a lifting point or recommend a lifting method from a photograph.
For lifting work in Great Britain, HSE's planning guidance addresses competence, foreseeable risks and suitable resources. The enquiry pack supports that assessment. It does not replace a movement plan.
Ask what the price assumes
Read the response against your pack. A quote may assume the machine is already disconnected, accessible on a suitable surface or loaded by the seller. Those conditions need explicit owners.
Use the dismantling scope guide if the equipment cannot leave intact. Where the contractor proposes a different configuration or route, ask for the quote and scope to reflect it.
Keep an enquiry log with the document version, contractor questions, answers and changes. If one contractor receives corrected weight information, provide it to the others before comparing prices.
Review the whole proposal
The contractor proposal checks cover competence, responsibilities and unresolved actions. A lower price may reflect a smaller scope, a different timetable or an assumption that the site provides assistance.
Build the accepted proposal into the collection budget. Identify provisional costs, waiting arrangements and excluded work from the written terms. Do not invent a standard allowance or assume the haulier covers every part of removal.
Share the enquiry pack with UK Auction Group while collection requirements are being agreed. The resulting sale information can then describe a realistic movement requirement with the remaining unknowns visible.
Sources
This guide gives general information. Equipment-specific, legal, tax and safety decisions may need a qualified adviser or competent specialist. The guides do not promise sale prices, fees or results.